Case Studies

We're proud to show you some of the great projects we've supported

Case Studies

London Outlet Centre
Case Studies

On this page you will find case studies from a number of projects we have been involved in. The projects are a mixture of wall tie, windposts and masonry restraints projects and hopefully give you a sense of the type of work we are able to support.

If you would like to know more about a specific piece of work within any of the case studies please get in touch. If you have a particular requirement and are interested in knowing how we can support you then use our contact form to outline your enquiry. Alternatively, we are always happy to provide guidance over the phone.

London Designer Outlet

London Outlet Centre

Kidbrooke Village

Kidbrooke Village, Greenwich

Olympic Village

Olympic Village

Cowbridge Centre

Cowbridge

South Leicester College

South Leicester College

South Farm

South Farm & Equestrian Centre

Holland & Barrett

Holland & Barrett

"Vision overcame ever changing detail issues due to size and specification requirements of the client, with this in mind I would have no problem working with Vision in the future"

Chris Thompson - Senior Project Manager, North Midland Building Limited

This was the first time we had split the brickwork and restraint package and would not hesitate to procure in the way again using Vision.

Chris Came - Senior Site Manager, Stepnall Limited.

Materials & Fixings

Windposts and brick ties are normally manufactured from Grade 304 stainless steel. (Grade 316 is also available, if required.) For dry internal applications, hot dip galvanised windposts can be manufactured, but it is recommended that the ties in the outer skin are stainless, even if the windpost is hot dip galvanised.

Generally bricklayers / labourers fix windposts, this not only stops the bricklayer laying bricks but as they are not structural engineers can result in various problems.

Vision Installers

Vision Installers

Vision installers are trained and experienced in the fitting of masonry windposts, we offer time served operatives that are able to overcome any fitting issues. Our windpost installers will fit up to 30 posts per day depending on the specification, this not only allows bricklayers to be more productive but also speeds up tight site programmes which is essential in modern day construction.

With Vision fitting your windposts you are guaranteed they are fitted to specification with the correct fixings. All fixing bolts are tightened to the specified torque settings. The posts are plum and fixed to the correct location. Considerably more windposts will be fitted on a daily basis and a QA sign off sheet for each floor fitted will be provided weekly which gives you a holding point with the clerk of the works. Your windposts will be fitted once and fitted right.