Pricing Comparison Chart

Giving you more reasons to choose Vision for fitting masonry wall ties

Wall Ties Savings Comparison

Ties fitted 100 ties 150 ties 200 ties 250 ties   Ties fitted 100 ties 150 ties 200 ties 250 ties
Fit time per tie 3 Mins 3 Mins 3 Mins 3 Mins   Fit time per tie 2 Mins
Tie x fit time 100 x 3 150 x 3 200 x 3 250 x 3   Tie x fit time 100 x 2 150 x 2 200 x 2 250 x 2
Total minutes 300 450 600 750   Total minutes 200 300 400 500
Total minutes / 60 300 / 60 450 / 60 600 / 60 750 / 60   Total minutes / 60 200 / 60 300 / 60 400 / 60 500 / 60
Hours 5 7.5 10 12.5   Hours 3.33 5 6.67 8.33
Laid blocks based on 200 per man per 8 hour day   Contract labour rates per tie
 
Hours 5 7.5 10 12.5   Ties fitted 100 ties 150 ties 200 ties 250 ties
Blocks laid in time period 125 187.5 250 312.5   Labour only cost per tie 1.10 1.10 1.10 1.10
Nr of blocks / 10 for m2 12.5 18.75 25 31.25   Total cost 110.00 165.00 220.00 275.00
Price per m2 14.00 14.00 14.00 14.00    
Total m2 x m2 rate 175.00 262.50 350.00 437.50   Saving comparison
 
Money lost fitting ties   Ties fitted 100 ties 150 ties 200 ties 250 ties
  Bricklayer fixing 175.00 262.50 350.00 437.50
Hours 5 7.5 10 12.5   Vision fixing 110.00 165.00 220.00 275.00
Total money lost 175.00 262.50 350.00 437.50   Overall saving 65.00 97.50 130.00 162.50
(Not laying blocks)  
  Project amounts 1000 ties 5000 ties 10000 ties 15000 ties
  Bricklayer fixing 1,750.00 8,750.00 17,500.00 26,250.00
  Vision fixing 1,100.00 5,500.00 11,000.00 16,500.00
Overall saving (Money) 650.00 3,250.00 6,500.00 9,750.00
  Overall saving (Hours/Days) 50 / 6.25 250 / 31.25 500 / 62.5 750 / 93.75
Notes:
  • The above does not allow for the bricklayers being paid for fixing ties ie: 50p per tie. This therefore increases costs and makes Vision rates more cost efficient.
  • *3 minutes per tie is based on all material and plant being at the bricklayers side, the 3 minutes are made up of the bricklayer stopping laying, fitting gauge tape to steel, pre-drilling steel with cobolt drill bit, changing pistol drill to tech gun, fixing framecramp to steel with tech screw and fitting debond sleeve.
  • (Productive hours / days saved to lay bricks which in turn speeds up the progamme and allows your bricklayers to earn you more money)
  • Time to fit would increase significantly if the bricklayer had to wait for / fetch the drill or materials every time it was required
BAM Construction

We have subcontracted Vision Ltd to install brickwork support angles. They are providing an efficient and professional service with competitive rates.

I would not hesitate in using Vision again on future projects.

Ian French - BAM Construction, Construction Manager.